{"id":56615,"date":"2023-05-10T12:08:36","date_gmt":"2023-05-10T09:08:36","guid":{"rendered":"https:\/\/oikom.gr\/projects-services\/nature-monitoring\/"},"modified":"2026-02-26T13:38:03","modified_gmt":"2026-02-26T11:38:03","slug":"nature-monitoring","status":"publish","type":"page","link":"https:\/\/oikom.gr\/en\/projects-services\/nature-monitoring\/","title":{"rendered":"Environmental Licensing and Monitoring"},"content":{"rendered":"<div class=\"wpb-content-wrapper\"><p>[vc_row full_width=&#8221;stretch_row_content&#8221; enable_overlay=&#8221;enable_overlay_value&#8221; overlay_pattern=&#8221;transperant&#8221; overlay_pattern_opacity=&#8221;25&#8243; type=&#8221;vc_default&#8221; margin_top=&#8221;-50&#8243; css=&#8221;.vc_custom_1689075830756{padding-top: 10% !important;background-image: url(https:\/\/oikom.gr\/wp-content\/uploads\/2023\/06\/header-company.jpg?id=55941) !important;background-position: center !important;background-repeat: no-repeat !important;background-size: cover !important;}&#8221;][vc_column offset=&#8221;vc_col-lg-12 vc_col-md-12&#8243; css=&#8221;.vc_custom_1538996790236{padding-bottom: 10px !important;}&#8221;]<div id=\"ultimate-heading-50969ef7c3eecec8\" class=\"uvc-heading ult-adjust-bottom-margin ultimate-heading-50969ef7c3eecec8 uvc-5168 bg_title\" data-hspacer=\"no_spacer\"  data-halign=\"left\" style=\"text-align:left\"><div class=\"uvc-heading-spacer no_spacer\" style=\"top\"><\/div><div class=\"uvc-main-heading ult-responsive\"  data-ultimate-target='.uvc-heading.ultimate-heading-50969ef7c3eecec8 h2'  data-responsive-json-new='{\"font-size\":\"desktop:40px;\",\"line-height\":\"desktop:50px;\"}' ><h2 style=\"--font-weight:theme;color:#ffffff;\">Environmental Licensing and Monitoring<\/h2><\/div><\/div>[\/vc_column][\/vc_row][vc_row][vc_column][vc_column_text]<\/p>\n<p style=\"font-weight: 400;\">With many years of experience, OikoM has prepared and coordinated a significant number of <strong>Environmental Impact Studies<\/strong> for a wide range of projects in both\u00a0public and private sectors (renewable energy sources, tourism investments, hydraulic works, road projects, port facilities, etc.), whether in protected areas or not.<\/p>\n<p style=\"font-weight: 400;\">Among the significant projects in this field are major investment plans for which OikoM Ltd. took on the assessment of their feasibility, redesigning them (when necessary), supporting them with the Permitting Authority, and obtaining their final licensing.<\/p>\n<p style=\"font-weight: 400;\">A fundamental component of environmental permitting is the <strong>Special Ecological Assessment<\/strong>, which is conducted to examine the &#8220;appropriate assessment&#8221; of the impacts of a project within\u00a0a Natura 2000 Network area (Article 6 of Directive 92\/43\/EEC).<\/p>\n<p style=\"font-weight: 400;\">Focusing on conservation objectives, it emphasizes the consequences of the project under licensing in relation to the integrity of the specific area. Fieldwork is required to collect data (avifauna, bats, habitat types, etc.) for its preparation.<\/p>\n<p style=\"font-weight: 400;\">Among the significant projects in this field are Special Ecological Assessments for a wide range of projects in protected areas, Special Areas of Conservation, and Special Protection\u00a0Areas. Fieldwork is carried out by OikoM\u2019s staff\/specialist scientists or selected external collaborators from various specialties with whom the company maintains long-term cooperation.<\/p>\n<p>[\/vc_column_text]<div class=\"standard-arrow list-divider bullet-top\"><h4>Selected projects:<\/h4>\n<ul>\n<li>Environmental Impact Assessment (including an Environmental Management Plan and accompanying Revegetation\/Landscape Restoration Studies), and Special Ecological Assessment for avifauna (based on field surveys), within the environmental permitting process of a special 310 MW Wind Farm project (and associated infrastructure) in the regions of Euboea and Attica. GH WIND (2024 \u2013 2026)<\/li>\n<li><a href=\"https:\/\/oikom.gr\/en\/conducting-of-avifauna-monitoring-for-the-vysima-wind-farm-in-florina\/\">Conducting of Avifauna monitoring for the VYSIMA wind farm, in Florina Regional Unit (in compliance with an environmental term of the ETA decision). VYSIMA VENDAVEL S.A. (2025 \u2013 2026)<\/a><\/li>\n<li><a href=\"https:\/\/oikom.gr\/en\/special-ecological-assessment-appropriate-assessment-in-the-context-of-the-environmental-licensing-of-a-hybrid-station-on-megisti-island-in-the-dodecanese\/\">Special Ecological Assessment &amp; Appropriate assessment (including field work survey) in the context of the environmental licensing of a Hybrid Station on Megisti Island (Dodecanese Regional unit). Public Power Corporation S.A. (2025)<\/a><\/li>\n<li><a href=\"https:\/\/oikom.gr\/en\/special-ecological-assessment-appropriate-assessment-in-the-context-of-the-environmental-licensing-of-the-project-existing-facilities-of-the-kaiafas-spa-in-ilia\/\">Special Ecological Assessment &amp; Appropriate assessment (including field work survey) in the context of the environmental licensing of the project \u2018Existing facilities of the Kaiafas Spa\u2019 (Ilia Regional Unit). Hellenic Public Properties Co. HPPC. (2025)<\/a><\/li>\n<li><a href=\"https:\/\/oikom.gr\/en\/technical-environmental-study-carrying-out-of-suggestions-for-environmental-protection-areas-in-the-region-of-the-hilarion-hydroelectric-station-in-the-middle-course-of-the-aliakmon-river\/\">Technical Environmental Study \u2013 Carrying out of suggestions for environmental Protection Areas in the region of the Hilarion Hydroelectric Station, in the middle course of the Aliakmon river, at Kozani and Grevena Regional Units. PPC S.A. (2024 \u2013 2026)<\/a><\/li>\n<li><a href=\"https:\/\/oikom.gr\/en\/technical-environmental-study-for-the-avifauna-of-the-hilarion-hydroelectric-station-in-the-middle-course-of-the-aliakmon-river-at-kozani-and-grevena-regional-units\/\">Technical Environmental Study for the avifauna of the Hilarion Hydroelectric Station, in the middle course of the Aliakmon River, at Kozani and Grevena Regional Units. PPC S.A. (2024 \u2013 2026)<\/a><\/li>\n<li><a href=\"https:\/\/oikom.gr\/en\/biodiversity-environmental-monitoring-program-for-the-site-and-the-wider-area-of-the-municipal-airport-of-kastelorizo-dazo\/\">Conducting of Biodiversity Environmental Monitoring Program for the site and the wider area of the Municipal Airport of Kastelorizo (DAZO) in compliance with an environmental term of the ETA decision. HELLENIC CIVIL AVIATION AUTHORITY (2025 \u2013 2026)<\/a><\/li>\n<li>Environmental Impact Assessment Study (EIA) and Special Ecological Assessment (including the implementation of fieldwork for avifauna) for the Wind Power Plants KATO LIMNES\u2013MAKRYLOFOS\u2013VOSKOTOPOS\u2013KOUNIA in the Regional Unit of Evros. WPD HELLAS (2025)<\/li>\n<li>Preparation of a comprehensive Environmental Management Plan (EMP) and a Biodiversity Action Plan for 10 Solar Farms within the Municipality of Farsala (in compliance with an environmental term of the ETA decision). REN VALOREM HELLAS Ltd. (2024)<\/li>\n<li>Environmental Impact Study and Environmental Management Plan for the Small Hydroelectric Project (SHP) Thisoa, in the Municipality of Megalopoli, Regional Unit of Arcadia, with a capacity of 5 MW. Public Power Corporation Renewables \u2013 NANKO ENERGY S.H.P. GITANI S.A. (2023 \u2013 2024)<\/li>\n<li>Environmental Impact Assessment Study and Special Ecological Assessment (including fieldwork for avifauna and bats) for the Wind Power Plants Petra and Paleo Triethnes (Kilkis Regional Unit). BELLES EAST, BELLES WEST VENDAVEL Ltd. (2022 \u2013 2023)<\/li>\n<li>Provision of Environmental Coordinator services during the construction phase of the Vysima Wind Power Plant. VYSIMA VENDAVEL S.A. (2021 \u2013 2022)<\/li>\n<li><a href=\"https:\/\/oikom.gr\/en\/preparation-of-an-environmental-impact-assessment-study-and-a-joint-special-ecological-assessment-sea-for-a-cluster-of-wind-power-plants-platanos-distrata-liapourthi-agioi-taxiarches-agioi-apos\/\">Environmental Impact Assessment Study and Special Ecological Assessment (SEA), including Field surveys for avifauna, fauna, and habitat types, for a cluster of Wind Power Plants (Platanos, Distrata, Liapourthi, Agioi Taxiarches, Agioi Apostoloi, Trikorfo, Riza) in southern Evia. MOTOR OIL RENEWABLE ENERGY S.A. (2025 &#8211; \u00a0)<\/a><\/li>\n<li><a href=\"https:\/\/oikom.gr\/en\/preparation-of-environmental-impact-assessment-studies-eia-and-special-ecological-assessments-sea-for-avifauna-including-field-surveys-for-the-wind-power-plants-ori-souliou-and-thesprotika-in\/\">Environmental Impact Assessment Studies (EIA) and Special Ecological Assessments (SEA) for avifauna (including field surveys) for the Wind Power Plants Ori Souliou, and Thesprotika, in Epirus. GAIACOMM Ltd. (2021 \u2013 2023)<\/a><\/li>\n<li>Environmental Impact Assessment Study and Special Ecological Assessment (including the implementation of fieldwork for avifauna, habitat types, and flora) for the Wind Power Plants Megalexandros, Anemodarmeni (Regional Unit of Florina). MEGALEXANDROS VENDAVEL S.A. (2021 \u2013 2022)<\/li>\n<li>Implementation of fieldwork for avifauna, habitat types, and fauna, and preparation of Special Ecological Assessments for the Wind Power Plants Agnanti, Petrovouni, Xoflimeni, and the Wind Power Plants Prosilio, Gidovoski, Paliochori, in the Regional Units of Florina and Kastoria. RESINVEST S.A. (2021 \u2013 2023)<\/li>\n<li><a href=\"https:\/\/oikom.gr\/en\/preparation-of-preliminary-assessment-study-environmental-impact-assessment-studies-and-special-ecological-assessments-for-4-clusters-of-photovoltaic-pv-stations-in-thessaly\/\">Preliminary Assessment Study, Environmental Impact Assessment Studies, and Special Ecological Assessments for 4 clusters of Solar farms in Thessaly. REN VALOREM HELLAS Ltd. (2021 \u2013 2022)<\/a><\/li>\n<li>Environmental Impact Assessment Study and Special Ecological Assessment (including ornithological surveys) for the Wind Power Plant at the location Koukouli-Grivas, within the Municipality of Voio, in the Regional Unit of Kozani. VOLTERRA KOUKOULI S.A. (2021)<\/li>\n<li><a href=\"https:\/\/oikom.gr\/en\/ornithological-surveys-and-special-ecological-assessment-for-the-installation-of-3-wind-farms-at-the-locations-gerakas-rombos-kandila-kyrton-milia-kapetanios-livadokorfi-in-the-regional-unit-of-rodo\/\">Conducting ornithological surveys and Special Ecological Assessment for the installation of 3 Wind Farms at the locations Gerakas-Rombos, Kandila-Kyrton, Milia-Kapetanios-Livadokorfi in the Regional Unit of Rodopi (as part of the environmental permitting process). PPC Renewables S.A. (2012 \u2013 2013)<\/a><\/li>\n<li>Implementation of an ornithological monitoring program (and analysis of the efficieny of the collision avoidance system) in the area of the installed Wind Power Plant at the location Toumba-Anthovouni (Regional Unit of Florina). MOTOR OIL RENEWABLE ENERGY S.A. (2021 \u2013 2022)<\/li>\n<li>Implementation of ornithological surveys for the Mati Koskina, Skopia-Vrachaki wind Power Plant, the SKOPIA VRACHAKI Wind Power Plant, in the Regional Units of Rodopi and Evros, and preparation of Special Ecological Assessments (as part of the environmental permitting process). MOTOR OIL RENEWABLE ENERGY S.A. (2020 \u2013 2022)<\/li>\n<li>Environmental Impact Assessment Studies and their accompanying Environmental Management Plans for 4 Solar farms projects in the Regional Unit of Kozani. VENDAVEL ENERGEIAKI S.A. (2020 \u2013 2021)<\/li>\n<li>Environmental Impact Assessment Study and Environmental Management Plan for the Mavrovouni Wind Power Plant in Thessaly (as part of the environmental permitting process). SSE S.A. (2020)<\/li>\n<li>Provision of Environmental Coordinator services (and implementation of field surveys for avifauna) during the construction phase of the Mellia Wind Power Plant project (Regional Unit of Kozani) in compliance with an environmental term of the ETA decision. VENDAVEL ENERGEIAKI S.A. (2020)<\/li>\n<li>Preparation of an Environmental Management Plan (as part of the implementation of environmental terms of the Environmental Terms Approval Decision \u2013 ETA decision), for the Makrylakkoma and Profitis Ilias Wind Farms in Mani. \u0391\u0395\u039f\u039b\u0399\u039a\u039f PARK\u039f MAKRYLAKKOMA S.A., AEOLI\u039a\u039f PARK\u039f SAGIAS S.A. (2020)<\/li>\n<li><a href=\"https:\/\/oikom.gr\/en\/implementation-of-ornithological-monitoring-for-the-operational-wind-power-plant-eymorfia-in-kefalonia-for-the-year-2018\/\">Implementation of ornithological monitoring for the installed Wind Power Plant Eymorfia in Kefalonia (n compliance with an environmental term of the ETA decision). ENERGODYNAMIKI AIOLIKA PARKA KEFALLINIAS S.A. (2018 \u2013 2019)<\/a><\/li>\n<li><a href=\"https:\/\/oikom.gr\/en\/field-surveys-of-avifauna-and-bat-fauna-during-the-pre-construction-phase-at-the-orpheus-eptadendros-wind-power-plant-preparation-of-an-integrated-environmental-monitoring-program-for-const\/\">Field surveys of avifauna and bat fauna during the pre-construction phase at the Orpheus\/Eptadendros Wind Power Plant \u2013 Preparation of an Integrated Environmental Monitoring Program (in compliance with an environmental term of the ETA decision). TECH. ANEMOS S.A. (2018 \u2013 2019)<\/a><\/li>\n<li>Preparation of Environmental Management Plan and a technical report on the Active Management Study of Shrubland Habitats for Avifauna (including also avifauna field survey), within the framework of the environmental terms for the Wind Power Plants Makrylakkoma and Prof. Ilias in Man\u0399. AEOLIKO PARKO MAKRYLAKKOMA S.A., AEOLIKO PARKO SAGIAS S.A. (2017 \u2013 2018)<\/li>\n<li>Implementation of an impact monitoring programme on avifauna for the operating Wind Farm at the Magoula \u2013 Kazakou \u2013 Diplon site (10 WTs), as well as for its planned extension (7 WTs), as part of the implementation of an environmental term of the Environmental Terms Approval Decision (ETA decision). EL.TECH. ANEMOS SA. (2013 \u2013 2017)<\/li>\n<li>\u0395valuation of a project of 8 Wind farms and their supporting infrastructure in South Evia, in the context of the Equator Principles (Natura 2000 areas GR2420001, GR2420012). ENEL SA. (2013 \u2013 2014)<\/li>\n<li><a href=\"https:\/\/oikom.gr\/en\/special-ecological-assessment-of-avifauna-for-a-quarry-at-andros-island\/\">Special Ecological Assessment (including field work for avifauna) for a quarry at Andros island. Marinis \u2013 I. Exadaktilos SA. (2013)<\/a><\/li>\n<li>Environmental Impact Assessment Study for 35 Wind Power Plants with a total capacity of 975.2 MW in Crete. AEOLIKA PARKA KRITIS ELIKA S.A. (2011 \u2013 2012)<\/li>\n<li>Environmental Impact Assessment Study for the Mellia Wind Power Plant (39.1 MW) in the Regional Unit of Kozani \u2013 Scientific monitoring\/recording of bird species. VENDAVEL S.A.<\/li>\n<li>Preliminary assessment study, &amp; Environmental Impact Assessment (including ornithological surveying) for the installation of 8 wind farms (183 MW) in south Evia. TERNA ENERGIAKI S.A.<\/li>\n<\/ul>\n<p><em>the codes GRXXXXXXX refer to the Natura 2000 site codes<\/em><\/p>\n<\/div>[\/vc_column][\/vc_row]<\/p>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>[vc_row full_width=&#8221;stretch_row_content&#8221; enable_overlay=&#8221;enable_overlay_value&#8221; overlay_pattern=&#8221;transperant&#8221; overlay_pattern_opacity=&#8221;25&#8243; type=&#8221;vc_default&#8221; margin_top=&#8221;-50&#8243; css=&#8221;.vc_custom_1689075830756{padding-top: 10% !important;background-image: url(https:\/\/oikom.gr\/wp-content\/uploads\/2023\/06\/header-company.jpg?id=55941) !important;background-position: center !important;background-repeat: no-repeat !important;background-size: cover !important;}&#8221;][vc_column offset=&#8221;vc_col-lg-12 vc_col-md-12&#8243; css=&#8221;.vc_custom_1538996790236{padding-bottom: 10px !important;}&#8221;][\/vc_column][\/vc_row][vc_row][vc_column][vc_column_text] With many years of experience, OikoM has prepared and coordinated a significant number of Environmental Impact Studies for a wide range of projects in both\u00a0public and private sectors (renewable energy sources, tourism&hellip;<\/p>\n","protected":false},"author":11,"featured_media":0,"parent":56611,"menu_order":2,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"class_list":["post-56615","page","type-page","status-publish","hentry","description-off"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.4 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Environmental Licensing and Monitoring - OIKOM Environmental Studies Ltd.<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/oikom.gr\/en\/projects-services\/nature-monitoring\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Environmental Licensing and Monitoring - OIKOM Environmental Studies Ltd.\" \/>\n<meta property=\"og:description\" content=\"[vc_row full_width=&#8221;stretch_row_content&#8221; enable_overlay=&#8221;enable_overlay_value&#8221; overlay_pattern=&#8221;transperant&#8221; overlay_pattern_opacity=&#8221;25&#8243; type=&#8221;vc_default&#8221; margin_top=&#8221;-50&#8243; css=&#8221;.vc_custom_1689075830756{padding-top: 10% !important;background-image: url(https:\/\/oikom.gr\/wp-content\/uploads\/2023\/06\/header-company.jpg?id=55941) !important;background-position: center !important;background-repeat: no-repeat !important;background-size: cover !important;}&#8221;][vc_column offset=&#8221;vc_col-lg-12 vc_col-md-12&#8243; css=&#8221;.vc_custom_1538996790236{padding-bottom: 10px !important;}&#8221;][\/vc_column][\/vc_row][vc_row][vc_column][vc_column_text] With many years of experience, OikoM has prepared and coordinated a significant number of Environmental Impact Studies for a wide range of projects in both\u00a0public and private sectors (renewable energy sources, tourism&hellip;\" \/>\n<meta property=\"og:url\" content=\"https:\/\/oikom.gr\/en\/projects-services\/nature-monitoring\/\" \/>\n<meta property=\"og:site_name\" content=\"OIKOM Environmental Studies Ltd.\" \/>\n<meta property=\"article:modified_time\" content=\"2026-02-26T11:38:03+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"8 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/oikom.gr\\\/en\\\/projects-services\\\/nature-monitoring\\\/\",\"url\":\"https:\\\/\\\/oikom.gr\\\/en\\\/projects-services\\\/nature-monitoring\\\/\",\"name\":\"Environmental Licensing and Monitoring - OIKOM Environmental Studies Ltd.\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/oikom.gr\\\/#website\"},\"datePublished\":\"2023-05-10T09:08:36+00:00\",\"dateModified\":\"2026-02-26T11:38:03+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/oikom.gr\\\/en\\\/projects-services\\\/nature-monitoring\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/oikom.gr\\\/en\\\/projects-services\\\/nature-monitoring\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/oikom.gr\\\/en\\\/projects-services\\\/nature-monitoring\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"\u0391\u03c1\u03c7\u03b9\u03ba\u03ae\",\"item\":\"https:\\\/\\\/oikom.gr\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Projects &amp; Services\",\"item\":\"https:\\\/\\\/oikom.proactive.gr\\\/%ce%ad%cf%81%ce%b3%ce%b1-%cf%85%cf%80%ce%b7%cf%81%ce%b5%cf%83%ce%af%ce%b5%cf%82\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Environmental Licensing and Monitoring\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/oikom.gr\\\/#website\",\"url\":\"https:\\\/\\\/oikom.gr\\\/\",\"name\":\"OIKOM Environmental Studies Ltd.\",\"description\":\"\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/oikom.gr\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Environmental Licensing and Monitoring - OIKOM Environmental Studies Ltd.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/oikom.gr\/en\/projects-services\/nature-monitoring\/","og_locale":"en_US","og_type":"article","og_title":"Environmental Licensing and Monitoring - OIKOM Environmental Studies Ltd.","og_description":"[vc_row full_width=&#8221;stretch_row_content&#8221; enable_overlay=&#8221;enable_overlay_value&#8221; overlay_pattern=&#8221;transperant&#8221; overlay_pattern_opacity=&#8221;25&#8243; type=&#8221;vc_default&#8221; margin_top=&#8221;-50&#8243; css=&#8221;.vc_custom_1689075830756{padding-top: 10% !important;background-image: url(https:\/\/oikom.gr\/wp-content\/uploads\/2023\/06\/header-company.jpg?id=55941) !important;background-position: center !important;background-repeat: no-repeat !important;background-size: cover !important;}&#8221;][vc_column offset=&#8221;vc_col-lg-12 vc_col-md-12&#8243; css=&#8221;.vc_custom_1538996790236{padding-bottom: 10px !important;}&#8221;][\/vc_column][\/vc_row][vc_row][vc_column][vc_column_text] With many years of experience, OikoM has prepared and coordinated a significant number of Environmental Impact Studies for a wide range of projects in both\u00a0public and private sectors (renewable energy sources, tourism&hellip;","og_url":"https:\/\/oikom.gr\/en\/projects-services\/nature-monitoring\/","og_site_name":"OIKOM Environmental Studies Ltd.","article_modified_time":"2026-02-26T11:38:03+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"8 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/oikom.gr\/en\/projects-services\/nature-monitoring\/","url":"https:\/\/oikom.gr\/en\/projects-services\/nature-monitoring\/","name":"Environmental Licensing and Monitoring - OIKOM Environmental Studies Ltd.","isPartOf":{"@id":"https:\/\/oikom.gr\/#website"},"datePublished":"2023-05-10T09:08:36+00:00","dateModified":"2026-02-26T11:38:03+00:00","breadcrumb":{"@id":"https:\/\/oikom.gr\/en\/projects-services\/nature-monitoring\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/oikom.gr\/en\/projects-services\/nature-monitoring\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/oikom.gr\/en\/projects-services\/nature-monitoring\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"\u0391\u03c1\u03c7\u03b9\u03ba\u03ae","item":"https:\/\/oikom.gr\/en\/"},{"@type":"ListItem","position":2,"name":"Projects &amp; Services","item":"https:\/\/oikom.proactive.gr\/%ce%ad%cf%81%ce%b3%ce%b1-%cf%85%cf%80%ce%b7%cf%81%ce%b5%cf%83%ce%af%ce%b5%cf%82\/"},{"@type":"ListItem","position":3,"name":"Environmental Licensing and Monitoring"}]},{"@type":"WebSite","@id":"https:\/\/oikom.gr\/#website","url":"https:\/\/oikom.gr\/","name":"OIKOM Environmental Studies Ltd.","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/oikom.gr\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"}]}},"_links":{"self":[{"href":"https:\/\/oikom.gr\/en\/wp-json\/wp\/v2\/pages\/56615","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/oikom.gr\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/oikom.gr\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/oikom.gr\/en\/wp-json\/wp\/v2\/users\/11"}],"replies":[{"embeddable":true,"href":"https:\/\/oikom.gr\/en\/wp-json\/wp\/v2\/comments?post=56615"}],"version-history":[{"count":9,"href":"https:\/\/oikom.gr\/en\/wp-json\/wp\/v2\/pages\/56615\/revisions"}],"predecessor-version":[{"id":58714,"href":"https:\/\/oikom.gr\/en\/wp-json\/wp\/v2\/pages\/56615\/revisions\/58714"}],"up":[{"embeddable":true,"href":"https:\/\/oikom.gr\/en\/wp-json\/wp\/v2\/pages\/56611"}],"wp:attachment":[{"href":"https:\/\/oikom.gr\/en\/wp-json\/wp\/v2\/media?parent=56615"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}